Best Practice | Future-tech https://www.future-tech.co.uk Data Centre Design, Build & Construction Tue, 26 Aug 2025 16:13:38 +0000 en-GB hourly 1 https://wordpress.org/?v=6.9.4 The Unseen Crisis: HOW TO PREVENT Unplanned Data Centre Outages https://www.future-tech.co.uk/unplanned-data-centre-outages/ Thu, 29 Aug 2024 13:30:00 +0000 https://www.future-tech.co.uk/?p=8286 In today’s digital age where every second counts, unplanned data centre downtime can lead to catastrophic consequences. From financial losses to reputational damage, the impacts of these outages are far-reaching. In this blog, we delve into the causes, consequences, and prevention strategies for unplanned data centre outages, shedding light on this often-overlooked potential for economic […]

The post The Unseen Crisis: HOW TO PREVENT Unplanned Data Centre Outages first appeared on Future-tech.]]>
How Does Warm Weather Impact Your Data Centre? https://www.future-tech.co.uk/how-does-warm-weather-impact-your-data-centre-challenges-strategies/ Fri, 04 Aug 2023 15:06:33 +0000 https://www.future-tech.co.uk/?p=8062 In ever-unpredictable climates and warm weather spells, we are becoming even more conscious that data centres can be significantly affected by hot weather conditions. This is a growing concern as global temperatures continue to rise. Here are some of the ways hot weather can impact data centres: Data Centre Cooling outages IT Equipment hosted within […]

The post How Does Warm Weather Impact Your Data Centre? first appeared on Future-tech.]]>
Data Centre Best Practices Article 8 – General Data Centre Operational Best Practice https://www.future-tech.co.uk/data-centre-best-practices-article-8-general-data-centre-operational-best-practice/ Sun, 31 May 2020 23:00:00 +0000 http://www.future-tech.co.uk/2020/01/06/data-centre-best-practices-article-8-general-data-centre-operational-best-practice/ This article is the eighth in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we highlight general data centres best practices which are considered beneficial to all sites regardless of size or location. These practices are based upon lessons learned by Future-tech during decades of operational experience while […]

The post Data Centre Best Practices Article 8 – General Data Centre Operational Best Practice first appeared on Future-tech.]]>
Data Centre Best Practices Article 7 – Data Centre Project Acceptance and Operational Reporting https://www.future-tech.co.uk/data-centre-best-practices-article-7-data-centre-project-acceptance-and-operational-reporting/ Thu, 30 Apr 2020 15:24:56 +0000 http://www.future-tech.co.uk/2020/07/03/data-centre-best-practices-article-7-data-centre-project-acceptance-and-operational-reporting/ This article is the seventh in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight those basic best practices which are essential to ensure that a new project or entire site is truly ready for live operation and customer service delivery. The intention is to […]

The post Data Centre Best Practices Article 7 – Data Centre Project Acceptance and Operational Reporting first appeared on Future-tech.]]>
Data Centre Best Practices Article 6 – IT Infrastructure Environmental and Operational Management https://www.future-tech.co.uk/data-centre-best-practices-article-6-it-infrastructure-environmental-and-operational-management/ Sun, 05 Apr 2020 23:00:00 +0000 http://www.future-tech.co.uk/2020/06/04/data-centre-best-practices-article-6-it-infrastructure-environmental-and-operational-management/ This article is the sixth in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight those basic best practices which are essential for effective cost and energy efficient management of deployed IT infrastructure within a data centre. In addition to close communication and liaison between […]

The post Data Centre Best Practices Article 6 – IT Infrastructure Environmental and Operational Management first appeared on Future-tech.]]>
Data Centre Best Practices Article 5 – IT Equipment Deployment https://www.future-tech.co.uk/data-centre-best-practices-article-5-it-equipment-deployment/ Wed, 11 Mar 2020 00:00:00 +0000 http://www.future-tech.co.uk/?p=1659 This article is the fifth in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight the basic best practices for deploying IT hardware in a data centre in order to maximise the available resources and minimise the potential for introducing problems. The key essential element […]

The post Data Centre Best Practices Article 5 – IT Equipment Deployment first appeared on Future-tech.]]>
Data Centre Best Practices Article 4 – Critical Facilities Operational Management https://www.future-tech.co.uk/data-centre-best-practices-article-4-critical-facilities-operational-management/ Tue, 11 Feb 2020 00:00:00 +0000 http://www.future-tech.co.uk/?p=1657 This article is the fourth in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight the basic best practices associated with operating a data centre from a Critical Facilities Management perspective. This involves the Monitoring, Management and Maintenance of the building infrastructure which ultimately supports […]

The post Data Centre Best Practices Article 4 – Critical Facilities Operational Management first appeared on Future-tech.]]>
Data Centre Best Practices Article 3 – General Planning and Design Best Practices (Environmental Control) https://www.future-tech.co.uk/data-centre-best-practices-article-3-general-planning-and-design-best-practices-environmental-control/ Mon, 27 Jan 2020 16:24:33 +0000 http://www.future-tech.co.uk/2020/07/03/data-centre-best-practices-article-3-general-planning-and-design-best-practices-environmental-control/ This article is the third in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight the starting points for any data centre project in relation to Environmental Control and lay down the basics for success in both the Build and Use phases. Environmental Control directly […]

The post Data Centre Best Practices Article 3 – General Planning and Design Best Practices (Environmental Control) first appeared on Future-tech.]]>
Data Centre Best Practices Article 2 – General Planning and Design Best Practices for Data Centres https://www.future-tech.co.uk/data-centre-best-practices-article-2-general-planning-and-design-best-practices-for-data-centres/ Tue, 21 Jan 2020 12:53:36 +0000 http://www.future-tech.co.uk/2020/07/03/data-centre-best-practices-article-2-general-planning-and-design-best-practices-for-data-centres/ This article is the second in a series of Data Centre Best Practice articles provided by Future-tech Ltd. In this article we seek to highlight the starting points for any data centre project and lay down the basics for success in both the Build and Use phases. General Planning and Design Best Practices Before commencing […]

The post Data Centre Best Practices Article 2 – General Planning and Design Best Practices for Data Centres first appeared on Future-tech.]]>
Data Centre Best Practices – Introduction and Background https://www.future-tech.co.uk/data-centre-best-practices-introduction-and-background/ Tue, 03 Dec 2019 00:00:00 +0000 http://www.future-tech.co.uk/2019/12/03/data-centre-best-practices-introduction-and-background/ Introduction to Data Centre Best Practices The single most important reason for a data centre’s existence is to maintain the availability of the services hosted within it and distributed from it. Data centre services are based on the IT equipment located within the building which requires four key resources including security, network resilience, and continuity […]

The post Data Centre Best Practices – Introduction and Background first appeared on Future-tech.]]>